November 2017

Work Performed in November

  • 355 square yards of sod
  • 255 linear feet  of 8” pipe
  • 6 Manholes
  • 12” rip rap has been installed
  • 521 linear feet of 26” pipe bursting
  • 144 linear feet of 30” bore 
Date: 
1/9/2018